trak | monitor 4.0

The HOPPECKE trak | monitor system helps you to increase operational safety and use your battery fleet and charging station as efficiently as possible. Our systems use state-of the-art technology but remain easy to use. trak | monitor is optimally configured for the HOPPECKE trak | chargers and trak | collect battery controllers, however, it can also be used for chargers made by any manufacturer. This makes it an optimum solution that allows you to react to the quickly changing markets and stand up to the strong competition. You can also respond proactively to increased energy costs and the increased environmental awareness among the general public, by ensuring that your company is using the most efficient, state-of-the-art technology.

trak | monitor 4.0

Technical data


  • Industrial trucks
  • Special-purpose vehicles
  • Cleaning machines
  • Control technology
  • Cold storage


Product data:

Construction NA
Series NA
Performance N.A.
Product group monitoring-and-management


 

Your advantages

  • Increased operational safety through timely warning of malfunctions of the water treatment system or disconnection of the load in critical situations
  • Reduction of electricity consumption and costs through individually controlled energy management
  • Peak load management in the charging station by shifting peak loads during off-peak times
  • Extended battery life through innovative charging technology
  • Absolute transparency
  • Reduced maintenance costs
  • Increased productivity
 

Downloads


Brochure

Language Filename Size Download
trak_monitor_4.0_brochure_de.pdf
0.6 MB | pdf-file
trak_monitor_4.0_brochure_en.pdf
0.8 MB | pdf-file


Case study

Language Filename Size Download
trak_monitor_case_study_de.pdf
0.3 MB | pdf-file


Case study

Language Filename Size Download
trak_Xchange_dimos_case_study_de.pdf
0.4 MB | pdf-file
trak_Xchange_dimos_case_study_en.pdf
0.4 MB | pdf-file


Case study

Language Filename Size Download
trak_ecomizer_case_study_de.pdf
1.4 MB | pdf-file
trak_ecomizer_case_study_en.pdf
1.5 MB | pdf-file


Case study

Language Filename Size Download
trak_xchange_sh-pratt_case_study_en.pdf
0.4 MB | pdf-file
trak_xchange_sh-pratt_case_study_de.pdf
0.4 MB | pdf-file